Welded sheet-metal assemblies · Hungary, EU

Your design.
Your brand.
Our steel.

We build welded steel assemblies for Europe’s equipment brands — parcel lockers, retail fixtures, self-checkout counters. Your drawing goes in. A finished, tested unit comes out, with your badge on the front. Four weeks from order.

ISO 9001:2015 · ISO 3834-2:2021 · 95% EXPORT

150+
PROFESSIONALS
22
YEARS
95%
EXPORT TO AT·DE·FR·NL
ISO 9001:2015
ISO 3834-2:2021
CERTIFIED
1–15
MM SHEET
200–10,000
PIECES A YEAR
4
WEEKS FROM ORDER
60%
SOLAR-POWERED

We make the part you do not want to make.

You own the product, the design, the platform and the customer. We own the metal.

Platt builds the enclosure, the frame, the carcass and the finish — cut, bent, welded, coated, assembled and tested in one factory. To your drawing. In your colour. With your name on it, not ours.

We do not design your product. We never will. Your drawing stays yours.

Three things we already know how to build.

You do not have to teach us the category.

Not a workshop with machines — one integrated smart factory.

Your part never leaves one digital system. ERP, WMS, APS and CAD/CAM plan it end to end. The automated warehouse answers in two minutes. Quality is measured by 3D scan, not judged by eye.

The Platt production hall
Engineering
Laser cutting
Bending
Rolling
Welding
Shot blasting
Surface treatment
Powder coating
Assembly and test

Nine technologies. Zero interfaces. Powder coating is ours; galvanizing and KTL run through certified partners, and we will tell you which is which.

Welding is certified to ISO 3834-2:2021 — robotic where a series needs it repeated without drift, by hand where the part is harder than the robot.

The numbers nobody else will give you.

Every supplier in this category hides lead time and minimum order behind a quote form. Here is ours, before you ask.

4weeks

From order to delivery. Series production, no special requirement.

10pieces

Minimum order.

200a year

Minimum annual volume to keep your tooling live.

6–8weeks

Validated first article, with a measurement report.

Tooling appears as a separate line in every quote. You always see what the changeover costs, and what it buys.

A finished, fitted Platt-built unit

From a drawing to a working checkout counter.

A customer sent us a drawing for a self-service checkout. We cut, bent and welded the body. We sourced the electronics. We assembled the unit, tested it, packed it and shipped it.

Not a kit. Not a box of parts. A working machine, ready to install.

“We don’t sell iron by the kilo — we provide solutions.”

LÁSZLÓ VIRÁG · MANAGING DIRECTOR, PLATT 2003 KFT.

Changing supplier, without the guesswork.

Most of our work starts by replacing someone. Here is exactly how that goes.

1

You send the drawing.

We quote it, with tooling costed as its own line. No changeover cost buried in a piece price.

2

We build a first article.

Six to eight weeks at the outside, at a cost agreed before we start.

3

You get numbers, not assurances.

A validated first article with a measurement report. It either matches your drawing or it does not, and you can see which.

4

Series production begins.

Four weeks from order. Minimum ten pieces. Minimum two hundred a year.

Year three matters more than week one.

Anyone can quote a first batch. Ask what happens in year three.

Same factory. Same tooling. Same jigs, same coating line, same finish. A replacement part in 2029 that still matches the run we shipped you in 2026.

We have not changed hands in 22 years, and we do not route your work to somebody else’s shop.

Quoting platforms are what you use when you have a drawing and need parts.

Platt is what you use when you have a product to build and a brand to protect.

The supplier your audit expects to find.

ISO 9001:2015 and ISO 3834-2:2021. Documented welding procedures. Traceable materials. 3D-scan measurement. A validated first article with a report attached.

Audit us unannounced. Any terminal, any order, drawing to delivery note, unescorted.

TUV Rheinland — ISO 9001:2015 certified management system
ECM — ISO 3834-2:2021 certified management system

TÜV Rheinland · Management System · ISO 9001:2015 — ID 9105083579, verifiable at tuv.com

ECM · Certified Management System · ISO 3834-2:2021

ISO 9001:2015 certificate (PDF) COMING SOON
ISO 3834-2:2021 certificate (PDF) COMING SOON

Among our references are companies such as Liebherr, CLAAS and KWB.

Liebherr CLAAS KWB

What we build, and what we don’t.

WE BUILD
Series of 200 to 10,000 a year, from batches of ten
Sheet from 1 to 15 mm
Assemblies up to 2000 × 1000 × 1000 mm and about 250 kg
Carbon steel and stainless — about 90% of our work. Aluminium, about 10%
Powder coating in-house, any colour and texture
Finished, assembled, tested units
To your construction
WE DON’T
One-offs and prototypes
Machining and milling — we are not a machine shop
Plastics
Structural steel over 250 kg
On-site construction work
Product design — that stays with you

Saying no is part of the service. If your part sits outside our sweet spot, we will tell you in the first call rather than the third month.

Send us a drawing, or book 30 minutes.

Tell us what you build and how many you need a year. We will tell you plainly whether it is our work.

Platt 2003 Kft.

H-3324 Felsőtárkány, Berva Ipartelep 2411 hrsz., Hungary

office@platt.hu
+36 30 602 4696

ATTACH A DRAWING
Attach your drawing to the email — or send it to office@platt.hu

Your enquiry reaches our sales team the same day. An engineer prepares the detailed calculation.